Water Main Installation Project

Project Overview

At the end of July, the Dedham-Westwood Water District’s contractor, Primetime Development, started installing a new section of water main on a portion of Schoolmaster Lane between 100 Schoolmaster Lane and Country Club Road.

The project consists of installing 1,325 linear feet of new water main, connecting it to the existing water mains at each end, installing fire hydrants and valves, and constructing new water services to each property within the work limits.

This project was highlighted as a high priority project in the district’s 2020 Capital Improvement Plan and will ultimately provide benefits to both the towns of Dedham and Westwood, as well as to all residents on Schoolmaster Lane by providing:

  • Improved Water Quality: Stagnant water is not conducive to providing the best water quality. By connecting the existing water main on Schoolmaster Lane with the water main across the street (on the Dedham Country & Polo Club side), both water mains will no longer be dead-ended, and water quality will improve.
  • Better Fire Protection: Hydrant flows increase dramatically when fed from two directions. The Fire Department will have a greater supply of water to fight any fires in the area, thereby reducing risk to all residents on Schoolmaster Lane.
  • Redundancy: Looping this water main provides both towns with another main water transmission line on the opposite side of I-95. Currently, all residents on Schoolmaster Lane would have a very limited water supply and fire protection if a water main break were to occur on West Street. This redundancy would be beneficial to commercial buildings that rely on critical water infrastructure, such as Dedham Medical, Hebrew Senior Life, and the Norfolk County Correctional Center.

Anticipated Impacts

While construction is underway, Schoolmaster Lane will remain open to residents and local traffic (mail delivery, trash pickup, visitors, etc.). However, intermittent delays will likely occur near the work zone. Police will be on-site during work hours to provide assistance. Due to the rocky terrain, heavy equipment will likely generate noise and vibration during work hours.

At times, residents who currently receive water from the District will have their water service temporarily disrupted. The District will notify affected residents 24 hours before any planned water disruptions. Sudden water disruptions are unplanned emergencies, and unfortunately, the District cannot notify customers in advance.

Residents are strongly encouraged to sign up for project email updates. The District will send routine communications weekly and, when feasible, emergency notifications.

Subscribe to Project Updates via Email

Weekly Construction Update

Summary of Completed Construction Activities, July 27-31, 2026:

  • Installed 60 feet of water main on Schoolmaster Lane and paved trenches.


Anticipated Construction Schedule for the Week of August 3-7, 2026:

Please Note: All construction activities are anticipated and may be changed due to weather or in-the-field changes.

Monday: A scheduled water disruption will occur for 100 and 105 Schoolmaster Lane. The crew will be installing valves.
The water disruption will occur from approximately 8 a.m. to 4 p.m., and the two affected properties were notified on Friday, July 31.

Tuesday-Friday: Water main installation on Schoolmaster Lane will continue. The crew will start past 105 Schoolmaster Lane and work their way back towards the culvert.

Progress Photos

Please check back!

Questions, Comments, or Emergency Assistance

Please direct questions or concerns about the project to the District by email or phone at
781-329-7090.